NOTICE:
This is a fragment page.
It is an internal page used by the Arstotzkan Universe Wiki, and is not meant to be read directly, but included by another. This page should be parented, see above.
NOTICE: ORIGINAL WORK WAS BY DJKAKTUS
LICENSED UNDER CC-BY-SA 3.0
Unauthorized access is forbidden.
Everything Must End
Containment Procedures: Containment of Item-001 is the responsibility of the 909 Council, and it is imperative that they establish its containment.
Description: Item-001 is a document with a strange connection to the 909 Council. This connection is significant.
To know the nature of Item-001 is to know the nature of the Council.
For more information, see Document 909-GOI.01-Operatus.
Addendum 001.1: Attached Documentation
